CIN-330-001 (Called-in application)
 https://www.dpea.scotland.gov.uk/CaseDetails.aspx?id=121825
 Faray Windfarm, Orkney, KW17 2DH
 -2.8253109
 59.219251
 1037250
 352985
 Erect 6 Wind Turbines (Maximum Height 149.9 Metres, Maximum Wind Farm Capacity 50Mw) With An Indicative Capacity Of 28.8 Mw, Erect A Meteorological Mast (Maximum Height 90 Metres) And A Substation, Construct Access Tracks, Crane Hardstandings, Underground Cabling, Transformers And A Slipway And Jetty, Create A Borrow Pit And Associated Infrastructure
 21 Sep 2021
 23 Sep 2021
 Orkney Islands Council (20/240/TPPMAJ)
 Mr Jay Hilton-Miller
 Orkney Islands Council
 Site Inspection, Further Written Submission
 Report
 Decision issued
 Ramsay, Elaine (Tel: 0131 244 7538 - Email: Planning.Decisions@gov.scot)
 Mr Michael Shiel
 09 Mar 2022
 21 Dec 2022 (Application Granted)
 Wind Farm (two or more turbines),
 
contains

  • <<
  • <
  • 1
  • >
  • >>
  • Displaying Results 0 - 1 of 1
Go To Page:
Date Sent/Received Date of Publication Type of Publication Submitting Party Document Name Size
23 Sep 2021 23 Sep 2021 Call-In Direction PAD Call-in letter and Direction 0.15MB (URL Details)

Click table headers to sort table

  • <<
  • <
  • 1
  • >
  • >>
  • Displaying Results 0 - 1 of 1