WIN-130-5 (Section 36 Wind Farm)
https://www.dpea.scotland.gov.uk/CaseDetails.aspx?id=121478
Sheirdrim Renewable Energy Development , On Land Within The Achaglass And Gartnagrenach Estates, Argyll And Bute, PA29
657098
181302
Application Under Section 36 Of The Electricity Act 1989 For The Installation Of A Renewable Energy Development Comprising 19 Wind Turbines (16 At 149.9 M To Blade Tip And 3 At 135 M To Blade Tip) And Two Ground Mounted Solar Development Areas With Associated Site Infrastructure Such As Substation And Access Tracks. It Would Produce Around 134 Mw And Between 360 - 380 Gwh Of Electricity Annually. A Battery Storage Facility
Would Also Be Installed With Storage Capacity Of Around 38 Mw
Argyll and Bute Council (19/02424/S36)
ScottishPower Renewables (UK) Ltd
Site Inspection, Inquiry, Hearing
18 Jun 2021
26 Jun 2023 (Application Refused)
Wind Farm (two or more turbines),