CIN-ORK-002 (Called-in application)
https://www.dpea.scotland.gov.uk/CaseDetails.aspx?id=121230
Lyness (Land Near), Hoy, Orkney,
Erection Of 6 Wind Turbines (Max Height 149.9 Metres, Max Wind Farm Capacity 50Mw) , Erect A Meteorological Mast (Max Height 90 M), With A Total Generating Capacity For The Site Would Be Approximately 28.8Mw, And A Substation, Construct Access Tracks, A Water Crossing And Underground Cabling, Create A Borrow Pit, And Associated Infrastructure
Orkney Islands Council (20/313/TPPMAJ)
Site Inspection
Court of Session Decision Issued
21 Dec 2021 (Application Granted)
05 Oct 2022
Wind Farm (two or more turbines),