WIN-170-2005 (Section 36 Wind Farm)
 https://www.dpea.scotland.gov.uk/CaseDetails.aspx?id=121226
 Shepherds Rig Wind Farm, Near Carsphairn, DG7
 -4.2620405
 55.212987
 593306
 256175
 Erection Of 17 Wind Turbines (15 Turbines Maximum Hight 149.9 Metres And 2 Turbines Maximum Height 125 Metres), An Anemometer Mast (Height 100 Metres), Estimated Installed Maximum Generation Capacity Of 78.6 Mw, Battery Storage Facility, Sub Station And Control Buildings, Formation Of Temporary Construction Compound, Two Borrow Pits, New Access, Access Tracks And Associated Works
 14 Oct 2020
 Dumfries and Galloway Council (8/1939/S36)
 Mr Fraser Gillies
 
 Site Inspection, Inquiry, Hearing
 Report
 Decision issued
 Kennedy, Christopher (Tel: 0131 244 6901 - Email: Christopher.Kennedy@gov.scot)
 Mrs Rosie Leven
 Ms Karen Heywood
 24 Feb 2021
 05 Oct 2022
 21 Aug 2023 (Application Granted)
 Wind Farm (two or more turbines),
 
contains