WIN-170-2005 (Section 36 Wind Farm)
 https://www.dpea.scotland.gov.uk/CaseDetails.aspx?id=121226
 Shepherds Rig Wind Farm, Near Carsphairn, DG7
 -4.2620405
 55.212987
 593306
 256175
 Erection Of 17 Wind Turbines (15 Turbines Maximum Hight 149.9 Metres And 2 Turbines Maximum Height 125 Metres), An Anemometer Mast (Height 100 Metres), Estimated Installed Maximum Generation Capacity Of 78.6 Mw, Battery Storage Facility, Sub Station And Control Buildings, Formation Of Temporary Construction Compound, Two Borrow Pits, New Access, Access Tracks And Associated Works
 14 Oct 2020
 Dumfries and Galloway Council (8/1939/S36)
 Mr Fraser Gillies
 
 Site Inspection, Inquiry, Hearing
 Report
 Decision issued
 Kennedy, Christopher (Tel: 0131 244 6901 - Email: Christopher.Kennedy@gov.scot)
 Mrs Rosie Leven
 Ms Karen Heywood
 24 Feb 2021
 05 Oct 2022
 21 Aug 2023 (Application Granted)
 Wind Farm (two or more turbines),
 
contains

  • <<
  • <
  • 1
  • >
  • >>
  • Displaying Results 0 - 4 of 4
Go To Page:
Date Sent/Received Date of Publication Type of Publication Submitting Party Document Name Size
18 Aug 2021 20 Aug 2021 Minute of Appointment Scottish Ministers Appointment of reporter - dated 18 August 2021 0.05MB (URL Details)
08 Dec 2020 08 Dec 2020 Minute of Appointment ECU Appointment of Rosie Leven and Karen Heywood 0.05MB (URL Details)
28 Oct 2020 28 Oct 2020 Opt-in Letter DPEA to Interested Parties Opportunity for interested parties to take part in opt-in process 0.15MB (URL Details)
28 Oct 2020 28 Oct 2020 Opt-in Letter DPEA to Consultees Opportunity for consultees to take part in opt-in process 0.15MB (URL Details)

Click table headers to sort table

  • <<
  • <
  • 1
  • >
  • >>
  • Displaying Results 0 - 4 of 4