WIN-170-2005 (Section 36 Wind Farm)
                
                
                
                    
                
                
                     https://www.dpea.scotland.gov.uk/CaseDetails.aspx?id=121226
                
                
             
            
                
                    
                
                
                     Shepherds Rig Wind Farm, Near Carsphairn, DG7
                
                
             
            
            
            
            
                
                    
                
                
                     593306
                
                
             
            
                
                    
                
                
                     256175
                
                
             
            
            
            
                
                    
                
                
                     Erection Of 17 Wind Turbines (15 Turbines Maximum Hight 149.9 Metres And 2 Turbines Maximum Height 125 Metres), An Anemometer Mast (Height 100 Metres), Estimated Installed Maximum Generation
Capacity Of 78.6 Mw, Battery Storage Facility, Sub Station And Control Buildings, Formation Of Temporary Construction Compound, Two Borrow Pits, New Access, Access Tracks And Associated Works
                
                
             
            
            
            
            
            
            
                
                    
                
                
                     Dumfries and Galloway Council (8/1939/S36)
                
                
             
            
            
            
            
                
                    
                
                
                     Site Inspection, Inquiry, Hearing
                
                
             
            
                
                    
                
                
                
             
            
                
                    
                
                
                     24 Feb 2021
                
                
             
            
            
            
            
                
                    
                
                
                     21 Aug 2023 (Application Granted)
                
                
             
            
            
            
            
                
                    
                
                
                     Wind Farm (two or more turbines), 
Battery Storage,