WIN-140-12 (Section 36 Wind Farm)
 https://www.dpea.scotland.gov.uk/CaseDetails.aspx?id=126931
 Oliver Forest Wind Farm, Land North Of Menzion Farm, Tweedsmuir , ML12 6QP
 -3.4533010
 55.502939
 624200
 308300
 An Application Under Section 36 Of The Electricity Act For The Construction And Operation Of Oliver Forest Wind Farm, Total Of Seven Wind Turbines With A Maximum Blade Tip Height Of 200 M, Foundations, Crane Hardstandings And Adjacent Laydown Areas, Access Tracks, Watercourse Crossings, Temporary Borrow Pits, Temporary Construction Compounds, Substation And Control Building, Battery Energy Storage System, Ancillary Infrastructure And Heritage Footpath.
 7
 200.00
 73.40
 09 Sep 2025
 Scottish Borders Council (NA)
 Winston Roberts
 Oliver Forest Wind Farm Limited
 Inquiry, Hearing
 Report
 Allocated to reporter
 Cowie, Karen (Tel: 0131 244 6936 - Email: Karen.Cowie@scot.gov.uk)
 Tammy Swift-Adams
 10 Sep 2026
 16/09/2026 at Tweedsmuir(nr Biggar) Village Hall
 04 Nov 2026
 **Case Update – 12/06/2026** One further written information request is currently outstanding. Invited parties are entitled to comment on the information submitted in relation with the further written submission request.
 Wind Farm (two or more turbines),
 
contains

  • <<
  • <
  • 1
  • >
  • >>
  • Displaying Results 0 - 2 of 2
Go To Page:
Date Sent/Received Date of Publication Type of Publication Submitting Party Document Name Size
10 Aug 2026 11 Aug 2026 Documents NATS Withdrawal Letter 0.07MB (URL Details)
09 Sep 2025 23 Sep 2025 Notice Applicant - Oliver Forest Wind Farm Limited S36 public notice (EIA) 0.08MB (URL Details)

Click table headers to sort table

  • <<
  • <
  • 1
  • >
  • >>
  • Displaying Results 0 - 2 of 2