WIN-130-10 (Section 36 Wind Farm)
 https://www.dpea.scotland.gov.uk/CaseDetails.aspx?id=125767
 An Carr Dubh Wind Farm, Located Between Inveraray To The South-East And Dalavich To The North-West, PA32
 -5.1650699
 56.249104
 710793
 204004
 An Application Under Section 36 Of The Electricity Act For The Construction And Operation Of The An Carr Dubh Wind Farm Comprising Of Up To 13 Wind Turbines, With A Maximum Blade Tip Height Of 180M
 13
 180.00
 85.80
 03 Dec 2024
 Argyll and Bute Council (N/A)
 
 Site Inspection, Further Written Submission, Inquiry, Hearing
 Report
 Allocated to reporter
 Davidson, Rebecca (Tel: 01312448263 - Email: Rebecca.Davidson@gov.scot)
 Mr Philip McLean
 05 Mar 2025
 21/08/2025 at Virtual Meeting
 18 Nov 2025
 **Case Update – 10/06/2025** Hearing sessions took place on 28 & 29 May 2025, and the webcasts can be viewed at www.dpea.public-i.tv. Further written submissions have been requested. An additional hearing session is scheduled for 21 August 2025 if the reporter decides it is required. Thereafter the report and recommendations will be finalised and submitted to Scottish Ministers as soon as possible.
 Wind Farm (two or more turbines),
 
contains

  • <<
  • <
  • 1
  • >
  • >>
  • Displaying Results 0 - 3 of 3
Go To Page:
Date Sent/Received Date of Publication Type of Publication Submitting Party Document Name Size
19 Mar 2025 19 Mar 2025 Correspondence Agent - Scott Valance Exchange supplying proposed site inspection araes 0.46MB (URL Details)
19 Mar 2025 19 Mar 2025 Correspondence Agent Exchnage supplying note of visualisations 0.38MB (URL Details)
06 Mar 2025 06 Mar 2025 Correspondence DPEA to agent and authority Exchange requesting input on potential locations of interest for site inspection 0.14MB (URL Details)

Click table headers to sort table

  • <<
  • <
  • 1
  • >
  • >>
  • Displaying Results 0 - 3 of 3