NA-330-001 (Notified application)
 https://www.dpea.scotland.gov.uk/CaseDetails.aspx?id=125898
 Hundland Hill (Land Near), Birsay, Orkney, KW17 2NR
 -3.2177240
 59.125046
 1027104
 330393
 Erect Four Wind Turbines (Maximum Height Of 180 Metres, Maximum Generation Capacity 26.4 Mw Total), A Substation And Maintenance Building, Create An Access, And Associated Infrastructure Including Access Tracks, Underground Cabling, Crane Hardstandings And Borrow Pit, Nisthill Wind Farm Limited.
 4
 180.00
 26.40
 27 Jan 2025
 27 Feb 2025
 Orkney Islands Council (22/320/TPPMAJ), Orkney Islands Council (22/320/TPPMAJ)
 Neil Collar
 Nisthill Wind Farm Limited
 Site Inspection, Further Written Submission, Inquiry
 Report
 Case on hold
 Murray, Claire (Tel: 01312448364 - Email: Claire.Murray2@gov.scot)
 Ms Alison Kirkwood
 07 Jul 2025
 04 Jun 2026
 **Case Update – 16/03/2026** The case has been placed on hold pending procedure notice responses.
 Wind Farm (two or more turbines),
 
contains

Go To Page:
Date Sent/Received Date of Publication Type of Publication Submitting Party Document Name Size
12 Jun 2025 13 Jun 2025 Environmental Report Agent - Wright, Johnston & Mackenzie LLP EIA Report - Volume 002 - Chapter 012 - Figure 12.1 - HydroGeoPeat Study Area and Designations 0.79MB (URL Details)
12 Jun 2025 13 Jun 2025 Environmental Report Agent - Wright, Johnston & Mackenzie LLP EIA Report - Volume 002 - Chapter 012 - Figure 12.2 - Local Hydrology 1.34MB (URL Details)
12 Jun 2025 13 Jun 2025 Environmental Report Agent - Wright, Johnston & Mackenzie LLP EIA Report - Volume 002 - Chapter 012 - Figure 12.3 - Superficial Geology 0.96MB (URL Details)
12 Jun 2025 13 Jun 2025 Environmental Report Agent - Wright, Johnston & Mackenzie LLP EIA Report - Volume 002 - Chapter 012 - Figure 12.4 - Bedrock Geology 0.79MB (URL Details)
12 Jun 2025 13 Jun 2025 Environmental Report Agent - Wright, Johnston & Mackenzie LLP EIA Report - Volume 002 - Chapter 012 - Figure 12.5 - Peat Depth 0.88MB (URL Details)
12 Jun 2025 13 Jun 2025 Environmental Report Agent - Wright, Johnston & Mackenzie LLP EIA Report - Volume 002 - Chapter 012 - Figure 12.6 - Potential GWDTE 0.85MB (URL Details)
08 Apr 2025 09 Apr 2025 Additional Environmental Information Authority Nisthill Wind Farm - Ornithology SEI Report - October 2022 - V1.0 0.56MB (URL Details)
08 Apr 2025 09 Apr 2025 Environmental Report Authority Nisthill Wind Farm - Ornithology SEI Report - October 2022 - Appendix 8.1 - V1.0 3.82MB (URL Details)
08 Apr 2025 09 Apr 2025 Additional Environmental Information Authority Nisthill Wind Farm - Ornithology SEI Report - October 2022 - Appendix 8.1 - CONFIDENTIAL Figures - Not Published 0.37MB (URL Details)
08 Apr 2025 09 Apr 2025 Additional Environmental Information Authority Nisthill Wind Farm - Ornithology SEI Report - October 2022 - Appendix 8.2 - V1.0 1.15MB (URL Details)