TRL-270-2 (Section 37 Transmission line)
 https://www.dpea.scotland.gov.uk/CaseDetails.aspx?id=127181
 Beauly To Peterhead Ohl
 Application For Consent Under Section 37 Of The Electricity Act 1989 To Install, Operate And Keep Installed Approximately 186 Km Of New 400 Kilovolt (Kv) Double Circuit Steel Structure Overhead Transmission Line (Ohl), Including Downleads, To Connect Into New Substation Sites At Fanellan (Nh 48321 42717) In The Area Of Beauly, Greens (Nj 81960 47587) In The Area Of New Deer And Netherton (Nk 05761 45576) In The Area Of Peterhead.
 18 Feb 2026
 Highland Council, Aberdeenshire Council, Moray Council, Aberdeenshire Council
 Ms Ursula Currie
 SSEN Transmission
 Inquiry
 Report
 Allocated to reporter
 Section 37 team, Beauly to Peterhead 400kV (Email: DPEA-Beauly-Peterhead400kVOHL@scot.gov.uk)
 Rosie Leven
 Mr David Buylla, David Liddell
 26 Aug 2026
 23 Apr 2026
 03 Feb 2027
 **Case Update – 05/05/2026** A pre-examination meeting to discuss the arrangements for the further examination into this case has taken place. The note of the meeting which sets out the procedures for further examination can be accessed under the Pre-Examination Meeting tab on the case file. If webcast the members of the public can view the proceedings at www.youtube.com/@DPEAScotGov
 Substation/Transmission Line/Pipeline,
 
contains

Go To Page:
Date Sent/Received Date of Publication Type of Publication Submitting Party Document Name Size
10 Sep 2026 10 Sep 2026 Correspondence DPEA to Mr Ian Kelly for Kirkhill & Bunchrew C.C. Points of clarification on LVIA and conditions 0.26MB (URL Details)
10 Sep 2026 11 Sep 2026 Correspondence DPEA to Ian Kelly RTPI Correspondence issued by DPEA 0.12MB (URL Details)
09 Sep 2026 10 Sep 2026 Correspondence DPEA to Parties Notification of additional environmental information 0.08MB (URL Details)
02 Sep 2026 02 Sep 2026 Correspondence DPEA to Applicant - SSEN Transmission Points of clarification on LVIA and conditions 0.50MB (URL Details)
31 Aug 2026 31 Aug 2026 Correspondence DPEA To Participants in the landscape and visual e Timetable for closing submissions and closing summaries 0.12MB (URL Details)
18 Aug 2026 18 Aug 2026 Correspondence DPEA to Applicant - SSEN Transmission Confirming acceptance of replacement document 016.043 0.43MB (URL Details)
18 Aug 2026 18 Aug 2026 Correspondence DPEA to inquiry parties Enclosing updated documents list and advising of replacement document 016.043 submitted by the applicant 0.67MB (URL Details)
18 Aug 2026 18 Aug 2026 Correspondence DPEA to Highland Council Acknowledging receipt of LVIA Report and Precognition with updated foundation document references 0.16MB (URL Details)
17 Aug 2026 17 Aug 2026 Correspondence DPEA and Allan, Fiona Further exchange regarding Pipeline AC Study Report 0.23MB (URL Details)
17 Aug 2026 17 Aug 2026 Correspondence DPEA to Strathisla Community Council Acknowledge receipt of community hearing statement 0.15MB (URL Details)

Click table headers to sort table