WIN-110-1 (Section 36 Wind Farm)
                
                
                
                    
                
                
                     https://www.dpea.scotland.gov.uk/CaseDetails.aspx?id=121426
                
                
             
            
                
                    
                
                
                     Fetteresso Wind Farm, Stonehaven, AB39 2NH
                
                
             
            
            
            
            
                
                    
                
                
                     785770
                
                
             
            
                
                    
                
                
                     385394
                
                
             
            
            
            
                
                    
                
                
                     Construction Of A Wind Farm Comprising; Two Turbines With A Maximum Height (Base To Tip) Not Exceeding 200 Metres; Two Turbines With A Maximum Height (Base To Tip) Not Exceeding 180 Metres; And Six Turbines With A Maximum Height (Base To Tip) Not Exceeding 149.9 Metres, With An Operating Portfolio Generating Capacity Of Over 569 Mw
                
                
             
            
            
            
            
            
            
                
                    
                
                
                     Aberdeenshire Council (APP/2019/1341)
                
                
             
            
            
            
            
                
                    
                
                
                     Site Inspection, Further Written Submission, Inquiry, Hearing
                
                
             
            
                
                    
                
                
                
             
            
                
                    
                
                
                     13 Sep 2021
                
                
             
            
            
            
            
                
                    
                
                
                     21 Sep 2022 (Application Granted)
                
                
             
            
            
            
            
                
                    
                
                
                     Wind Farm (two or more turbines),