BES-210-1 (Section 36 Wind Farm)
https://www.dpea.scotland.gov.uk/CaseDetails.aspx?id=128017
Springfield Farm, Cockburnspath, Berwickshire, TD13 5XJ
671213
375044
Springfield Solar Farm & Battery Energy Storage System (Bess) - A Ground-Mounted Solar Photovoltaic (Pv) Development With A Generating Capacity Of Up To Approximately 165 Megawatts (Mw) (Ac), Battery Energy Storage System (Bess) With A Generating Capacity Of Up To Approximately 80 Mw, Associated Infrastructure, Access, And Landscaping.
East Lothian Council (25/00003/SGC)
Inquiry, Hearing
Ready for allocation to reporter
**Case Update – 21/01/2026**
This case has been referred to DPEA for a Public Local Inquiry. The documents will be uploaded as soon as possible. Interested Parties to the case will be notified in due course and offered the opportunity to participate in the process.