WIN-270-26 (Section 36 Wind Farm)
https://www.dpea.scotland.gov.uk/CaseDetails.aspx?id=126236
Loch Liath Wind Farm, Land Located Within The Balmacaan Estate, Directly West Of The Great Glen And Loch Ness, IV63 6TW
824085
237981
Application For Consent Under S36 Of The Electricity Act 1989 And Deemed Planning Permission For The Construction And Operation Of The Loch Liath Wind Farm Comprising A Total Of 13 Wind Turbines With A Maximum Blade Tip Height Of 200 M
85.80
Highland Council (N/A)
Loch Liath Wind Farm Limited
Site Inspection, Further Written Submission, Inquiry, Hearing
30 Jun 2025
17/11/2025 at _TBC
**Case Update – 13/05/2025**
A virtual pre-examination meeting into this case will be held. The date can be viewed on the case website . Members of the public can view the proceedings at www.dpea.public-i.tv
Wind Farm (two or more turbines),