WIN-110-1 (Section 36 Wind Farm)
 https://www.dpea.scotland.gov.uk/CaseDetails.aspx?id=121426
 Fetteresso Wind Farm, Stonehaven, AB39 2NH
 -2.2418169
 56.962928
 785770
 385394
 Construction Of A Wind Farm Comprising; Two Turbines With A Maximum Height (Base To Tip) Not Exceeding 200 Metres; Two Turbines With A Maximum Height (Base To Tip) Not Exceeding 180 Metres; And Six Turbines With A Maximum Height (Base To Tip) Not Exceeding 149.9 Metres, With An Operating Portfolio Generating Capacity Of Over 569 Mw
 08 Feb 2021
 Aberdeenshire Council (APP/2019/1341)
 Ms Geum Howatson
 Fetteresso Wind Ltd
 Site Inspection, Further Written Submission, Inquiry, Hearing
 Report
 Decision issued
 Smith, Morag (Tel: 0131 244 8173 - Email: Morag.Smith@gov.scot)
 Mr Andrew Sikes
 13 Sep 2021
 02 Apr 2022
 21 Sep 2022 (Application Granted)
 Wind Farm (two or more turbines),
 
contains

  • <<
  • <
  • 1
  • >
  • >>
  • Displaying Results 0 - 2 of 2
Go To Page:
Date Sent/Received Date of Publication Type of Publication Submitting Party Document Name Size
23 Sep 2022 23 Sep 2022 Report DPEA Report - dated 18 February 2022 1.31MB (URL Details)
21 Sep 2022 23 Sep 2022 Decision Notice Energy Consents Unit Decision Notice - dated 21 September 2022 9.99MB (URL Details)

Click table headers to sort table

  • <<
  • <
  • 1
  • >
  • >>
  • Displaying Results 0 - 2 of 2