WIN-300-3 (Section 36 Wind Farm)
 https://www.dpea.scotland.gov.uk/CaseDetails.aspx?id=120129
 Pauls Hill 2 Wind Farm, Upper Knockando, Ballindalloch, AB37 9BS
 -3.4456153
 57.454215
 841358
 313355
 Proposed Wind Farm Comprising Of 7 Wind Turbines 6 Of A Maximum Height Base To Tip Not Exceeding 149.9M And 1 Of Maximum Height Not Exceeding 134M. External Transformer Housing Site Tracks, Crane Pad Foundations, Underground Electricity Cable, Control Building, Temporary Construction And Compound, 2 Borrow Pits And Associated Works/Infrastructure/Signage
 20 Dec 2018
 Moray Council (18/00523/S36)
 Fraser Gillies
 Paul’s Hill II Limited
 Site Inspection, Inquiry, Hearing
 Report
 Decision issued
 Case Owner, DPEA (Tel: 0300 244 6668 - Email: dpea@gov.scot)
 Mr David Buylla
 02 Sep 2019 at 10:00
 20 Mar 2019
 02 Mar 2020
 11 Dec 2020 (Application Granted in Part)
 Wind Farm (two or more turbines),
 